Food is an integral part of everyone's day-to-day life. Without food, you won't survive long, and neither will your neighbor nor the global population. That will lead to a significant reduction in human labor and the fall of institutions.
Similarly, if populations are fed with bad food, they can easily be wiped off the face of the earth, which will have similar effects as discussed above. That's why food hygiene and safety are the core of any food processing company. From the start of the company, that is, constructing the food processing facility, the company has to align all of its plans to meet the required standards for food safety.
This article will look more into food safety as a consideration for constructing a small-scale food processing facility. It'll also discuss other planning considerations, such as location and zoning regulations. Keep reading to learn more.
The federal government, specific city, state, and municipality govern the running of a food processing company. Regulations differ from state to state. These regulations also affect the construction of a food facility. For example, zoning regulations may allow or restrict the operation of a food company in a given estate according to building codes.
That said, the federal government's biggest concern is food hygiene and safety. The government established the Food and Drugs Administration (FDA), which ensures each processing company meets food safety conditions. Under the administration are laws such as Hazard Analysis and Critical Control Points (HACCP), which detail the procedures to be followed to minimize food contamination and the occurrence of biological, chemical, and physical hazards.
Another law is the Food Safety Modernization Act requiring that food safety be met through preventative measures. In this case, the company must avoid certain ingredients, storage methods, or distribution to avoid compromising food safety.
While this law may apply to the final product, their implementation starts from how the food facility is designed. For example, if the facility has an up-to-standard warehouse, food awaiting processing is less likely to be contaminated. Additionally, if the facility is damp, for example, an old house that has been revamped, there's a possibility that the dampness will cause food contamination through microorganisms such as molds.
When the food is contaminated, the processing facility risks being closed and you, the owner, being arrested and banned from handling food again for commercial consumption. Therefore, you want to make sure that you build a quality food processing facility to eliminate the risk of food contamination that might hinder your food safety performance when you start your business operations.
If you want to ensure that you comply with the laws discussed above, you can check TDI Packsys website for their automated inspection services.
When choosing the location where you will establish the facility, there are several things you should consider. They include:
The last thing you want is to start your construction, only to find out that the zoning regulations don't allow food processing companies in that area. To avoid such issues, check on the zoning regulations once you have identified your site of choice. The rules will determine how big your food processing plan can be by looking at the building codes. For example, does the drainage system in the area support the volume of activities from a small food processing facility?
Besides building codes, zoning determines the number of employees you can have. In this case, since your facility will be small, you may not necessarily have to worry about that. Additionally, depending on your state, the zoning regulation may determine the design of your food facility. For example, some states may allow building your facility from an existing kitchen, constructing a new facility, or rehabilitating an old house.
Although you should consider many other factors when planning for your food facility, the three discussed factors are the core of your plans. With the three figured out, you're better placed to start with the construction of your facility.