<img height="1" width="1" style="display:none;" alt="" src="https://px.ads.linkedin.com/collect/?pid=5133266&amp;fmt=gif">

PORT AUTHORITY OF NY & NJ: BUILDING 105

Project Information

NY Engineers performed MEP renovation work for building 105. The project consisted of replacing the facility’s roof, eight rooftop fans, three condensing units, four rooftop units, and one cooling tower that was removed and re-installed to accommodate the roof replacement. The mission-critical building was kept fully operational during the rooftop equipment replacement.

Location
Newark Liberty International Airport
Building 105
Budget
$3.2M
Area
5,000ft2

Get Pricing On a New MEP Design Proposal in Fewer than 24 Hours

Request a proposal →