CHALLENGES

KFC was planning to open a new store in Saginaw, Texas. The place was a small white box space with existing electrical, water, sanitary, and gas services provided by the base building.

The client was looking for a low-cost design by utilizing the existing services provided by the base building.

Following were the challenges- 

  1. Design the MEP system using existing base building services.
  2. Fit the complete system within a small space.
  3. Running the services from the existing service location to the new space by keeping the other existing commercial stores operational.

KFC

SOLUTION

Our team of design experts took the challenge and found the best possible routing for the gas and water piping without affecting the operations of other stores. Water, gas, and electrical power load were calculated and satisfied within the available existing load in compliance with all local and energy conservation requirements. Wall-mounted tankless water heater was provided to reduce the equipment space.

We saved the cost and time for the client by providing quick, and affordable design within 2 weeks which resulted in the smooth start-up of a new KFC store before the timeline.

Scope includes plumbing, HVAC & electrical.

Area- 3000 sq. ft.